Production Process

scroll

First. Cotting

process

Cotting

The coating process is the first step in the production of protective tape, which involves applying adhesive to fabric. As the adhesive is applied, the ordinary vinyl fabric becomes capable of functioning as protective tape.

Second. Drought

process

Drought

The second step, the drying process, is a special process that involves drying the adhesive components applied in the previous coating step at high temperatures to increase adhesion and prevent contamination of the adherend.

Passing through the drying process enables the product to perform its role as protective tape.

Dasung P&F uses a recycling device to prevent harmful chemical substances from being exposed to the atmosphere during the drying process and practices ESG management to reduce environmental impact.

Third. Winding

process

Winding

The third step, winding, is a process of making fabric that has gone through the coating and cutting process into a product that can be sold.

Passing through the drying process enables the product to perform its role as protective tape.

The machines used in this process are designed with proprietary technology by Dasung P&F to produce high-quality products.

Quad. Cutting

process

Cutting

This tape is designed to be applied to the exterior of window frames made from various materials such as PVC, aluminum, stainless steel, etc., providing protection to the product.

This tape is designed to be applied to the exterior of